The mechanical and electrical installation work of Metro Line 1 and Line 5 including water supply and drainage, environmentally controlled ventilation, and power lighting equipment, installation and commissioning, etc.
Message.
Tianjin Construction Engineering Group (Holding) Co., Ltd.