Home >> PROJECTS >> CONSTRUCTION
PROJECTS
M&E Engineering Work of First Teaching Hospital of Tianjin University of TCM
The scope of construction includes: air conditioning system engineering, ventilation and air conditioning and ancillary electrical engineering. This project adopts electric refrigeration unit(two screw-type chillers, total cooling load is 15,682kW) and gas-type modular hot water boiler(28 modular hot water boilers with a total heating capacity of 11,683kW) as the air conditioning cold and heat source.